Main Changes to Local Plan 2030

Policy S19 - Conningbrook Residential Phase 2 (MC25)

Page 104 Policy S19

Response to rep 1942

Response to rep 2674

Admin and Response to rep 2360

Amendments to Policy S19 – Conningbrook Residential Phase 2

Extend site boundary as shown in blue:

Amend para 4.213 to reflect increased capacity:

4.213 The site is considered suitable for redevelopment for residential use with an indicative capacity of 170 units for up to 120 units.

Add two new paragraphs after 4.220:

To the north-west of the site, within easy walking distance, there is an existing at-level crossing of the railway line. The Council’s preferred solution to this would be to replace the existing crossing with a new pedestrian / cycleway bridge over the railway in order to provide safer access. Therefore, any masterplan for the site should fully investigate the potential for it to deliver a new single bridge crossing over the railway line, in co-ordination with policy S2, with the intention of retaining the PRoWs as far as possible.

Southern Water’s assessment has revealed that additional sewerage infrastructure would be required to serve the proposed development. The development will therefore be required to make a connection to the nearest point of adequate capacity in the sewerage network. Early liaison should take place with the service provider in this regard.

Alterations to Policy S19 as follows:

The Conningbrook Phase 2 site is proposed for residential development with an indicative capacity of 170 for up to 120 dwellings. Development proposals for this site shall:

Add following new criterion:

l) Provide a connection to the nearest point of adequate capacity in the sewerage network, in collaboration with the service provider.